1 
 2 
Total Site Area:
6.33 acres
Total Building Footprint Area:
145,250 sq. ft.
Lock Haven University
CEDG was selected by the National Development Company of Pennsylvania (NDC) to be a member of the design/build team responsible for the design and construction of a 408 bed off-campus student housing facility for the Lock Haven University Foundation (LHUF). Due to the aggressive nature of the construction schedule, CEDG was tasked with securing preliminary/final land development plan (PFLD) approval from the City of Lock Haven in no more than sixty (60) days. Through extensive "up front" coordination between NDC, CEDG, the project architect and Lock Haven City staff, PFLD was obtained in a total of nine (9) days from date of submission of the plans to receipt of approval from the City of Lock Haven.

Services:
  • Coordination of site layout design with the project architect
  • Preparation of grading plans
  • Preparation of site utility plans
  • Preparation of site lighting and landscaping plans
  • Preparation of erosion and sedimentation control plans and securing of NPDES general permit from the Clinton County Conservation District
  • Preparation of land development plans, attendance at municipal meetings and securing of preliminary/final land development plan approval
  • Preparation of sanitary sewer module exemption package
  • Coordination with the City of Lock Haven staff on plan approval, utility and zoning issues
  • Regular attendance at coordination meetings with design team members and LHUF representatives
  • Addressing construction challenges/contractor questions
    during construction